Wild Synapse

Consulting

The assessment, and the fieldwork behind it.

Impact assessment work for mining, renewable energy and infrastructure, and acoustic analysis for researchers who need a species list out of a season of recordings. The same people do both, which is why the surveys and the analysis answer the same question.

Based in Bengaluru · Working across India, and with researchers overseas

A bat calling above a canopy, a detector recording on a post below it, and the spectrogram those calls produce

What we do

Four services, one field team.

Each of these can be a standalone commission or a component of a larger assessment. Where a statutory report needs an accredited expert, we work with Nisarg Setu, whose founder is a QCI‑NABET accredited Functional Area Expert in Ecology and Biodiversity.

Monitoring points across baseline, construction and operation phases, continuing past commissioning

Environmental Impact Assessment Statutory

  • Baseline studies across the biological environment, to the scope the project's terms of reference set
  • Prediction and evaluation of impacts through construction and operation, not only at commissioning
  • Mitigation and monitoring plans written to be auditable after consent, not only to secure it
  • Accredited sign-off on the ecology and biodiversity component, through our collaboration
The mitigation hierarchy as a descending cascade: avoid, minimise, restore, offset

Ecological Impact Assessment Species and habitat

  • Species baselines for bats, birds, herpetofauna and insects, by survey method appropriate to each
  • Habitat characterisation and the functional connectivity a site provides to the wider landscape
  • Significance evaluation against the receptors that actually matter on the site, rather than a generic checklist
  • The mitigation hierarchy applied in order — avoid, minimise, restore, offset — and said plainly where avoidance was possible
A bat commuting route crossing an approach path above a runway, with the overlap marked

Wildlife Hazard Management Aviation and industry

  • Strike risk assessment for bats and birds, from the species and activity actually present at the site
  • Acoustic and visual monitoring across the periods when risk is highest, which for bats is rarely daylight
  • Mitigation design addressing what draws animals to the site, not only what to do once they are there
  • Post-implementation monitoring, because a mitigation that was never measured is an assumption
A recorder, a waveform, a spectrogram and the resulting species list, with one pair left unresolved

Bioacoustics Analysis Recordings to results

  • Passive acoustic monitoring designed, deployed and analysed, or analysis alone on recordings you already hold
  • Bat call identification to the resolution the calls support, with the uncertainty stated rather than hidden
  • Activity and phenology — nightly patterns, seasonal change, and how both respond to a disturbance
  • Data you keep, in formats other tools can read, with the measurements that produced each conclusion

Track record

Where this work has been done.

Airports in IndiaThe team has worked with airports in India assessing bat strike risk and designing mitigation for it. Bat activity at an aerodrome is a different problem from bird activity, and is usually measured with the wrong instrument or not at all.
Indian Air ForceThe same work for the Indian Air Force — assessing bat hits and providing mitigation. Military airfields bring their own constraints on what can be surveyed, when, and with what equipment.
Mining, conveyor noiseAcoustic studies to understand the effect of a mining conveyor belt on bats. Continuous industrial noise is a different exposure from blasting or traffic, and the question is whether it displaces animals from habitat they would otherwise use.

For researchers

Bat call analysis, at a price that works for a research budget.

A season of passive monitoring produces more recordings than most projects have time to work through, and commercial analysis is often priced for a consultancy rather than a grant. We take that work on for researchers wherever they are based.

What you sendFull-spectrum or zero-crossing recordings, with whatever metadata the detector wrote. GUANO and WAMD are read directly; a deployment log in any readable form is enough.
What comes backA species list with the confidence each identification carries, per-call measurements, activity summaries by night and season, and the project file so you can inspect any call yourself.
What we will not doIdentify beyond what the calls support. Where two species overlap in a region and a call sits in the overlap, it is reported as a species pair, not resolved by preference.
Done in AURAThe same workstation we publish. Analysis is reproducible from the project file, and you can open it yourself — the Basic tier is free for students and independent researchers.

Who this is for

Mining, renewables, infrastructure — and the people counting what lives there.

A section through a quarry: a benched cut, a conveyor above, and its noise reaching a cave roost in the rock below

Mining Sector

  • Baseline and operational-phase assessment for new leases, expansions and conveyor corridors, to the scope the financing requires
  • Cave and crevice roost survey where extraction and bat habitat meet, which in limestone is routinely
  • Noise and vibration exposure assessed against the animals present, not a generic threshold
A turbine swept area with activity at rotor height, and a solar array with insects drawn to the panels

Renewable energy Wind and solar

  • Wind farms — pre-construction bat and bird activity surveys, with collision and barotrauma risk evaluated from activity measured at rotor height where access allows
  • Solar farms — habitat loss across the footprint, severance where perimeter fencing cuts a movement corridor, and the insect and bird activity drawn by polarised reflection off panels
  • Both — baseline survey before consent and monitoring after it, so a curtailment or mitigation decision rests on data from the site rather than from the literature
  • Extensions and repowering — assessed against what the operating site already supports, not from a blank baseline
A linear corridor severing habitat with one crossing retained, beside an aerodrome

Infrastructure and aviation Sector

  • Wildlife hazard assessment for aerodromes, and mitigation that survives an audit
  • Linear infrastructure — roads, rail and transmission — assessed for severance as well as direct loss
  • Monitoring programmes a site team can actually run once the consultants have left

Lender standards

Written to the framework your financing applies.

Development finance carries safeguard requirements that decide what an assessment has to contain, and a biodiversity chapter that does not meet them holds up disbursement rather than the other way round. We take that component on explicitly, written to the framework the project actually falls under and structured so a reviewer can find what they are looking for.

IFC Performance StandardsPS1 for the assessment and management process, PS6 for biodiversity — the 2012 text with Guidance Note 6 (2019). Habitat screened as modified, natural or critical, and where critical habitat is triggered, a net gain that can be demonstrated rather than asserted.
Equator Principles (EP4)In force since October 2020. For projects outside high-income OECD countries it binds member banks to the IFC Performance Standards, which is why PS6 governs most commercially financed work even where no development bank is involved.
ADB Environmental and Social FrameworkEffective 1 January 2026, for projects whose concept note was approved on or after that date. The Safeguard Policy Statement (2009) continues to govern projects approved before it, so the first question is which of the two your project sits under.
World Bank ESFESS1 for environmental and social assessment and ESS6 for biodiversity and living natural resources, including the primary-supplier scope that a footprint-only survey misses.
Where we fit, plainly.

We are a specialist, not an ESIA lead. On a financed project the bat and bioacoustics work is usually the part a general consultancy subcontracts: acoustic survey design, activity measured at rotor height, roost survey where extraction meets karst, critical habitat screening for bats, and monitoring a site team can still run after consent. That is the scope we take — directly for a developer, or as a subconsultant to the firm holding the ESIA.

Our commitment

A methodology designed for the site, not carried over from the last one.

The decisions that determine whether an assessment is worth anything are made before anyone reaches the field: what to survey, where, how often, with what equipment, and what would count as an answer. Get those wrong and no amount of fieldwork recovers it. The report still gets delivered. It is simply not about the site.

Why we say this.

We have read tender responses in which the survey methodology was written by someone with no working knowledge of the taxa being assessed. A fixed number of survey nights regardless of the question. A detector on whichever post was convenient. A species list produced by software that nobody checked against a reference call. Work like that clears a procurement checklist and answers no ecological question — which is worse than a weak assessment, because it carries the authority of a document while containing none of the content. Our objection is to the practice, not to any firm; it is common enough to be worth naming.

Two we keep seeing

Case 1 — The most common version of it

An RFP specifies passive recorders at a fixed height across the site. It reads like a controlled design, and it is not one. How far a detector hears depends on the call it is listening for, and across one assemblage that varies by an order of magnitude: a horseshoe bat calling near 100 kHz attenuates within a few metres of the microphone, while a free-tailed bat calling near 20 kHz carries from tens of metres away — and forages far above the height any survey mast is likely to reach. Flight height varies the same way, by foraging guild. One height does not sample one volume. It samples a different volume for every species, and for some of them it samples nothing at all.

The same holds above the bats. Nocturnal bird migration happens at altitudes a ground-level microphone does not reach, so a design that never asks the question returns a clean dataset and an incomplete site.

The consequence is not a gap in a table. A species not recorded is a species absent from the baseline, and where that species is Critically Endangered or Vulnerable, the absence carries into the critical habitat screening, the mitigation design and the consent conditions built on them. Nobody finds the error later, because the survey was carried out exactly as specified. That is what makes it dangerous rather than merely poor.

Case 2 — And the one that is hardest to catch

Bioacoustics is not a single discipline. Bird song is largely a communication signal — stereotyped, frequently diagnostic, and sitting within the audible range. Echolocation is not a communication signal at all. It is a sensory one, shaped moment to moment by what the animal is doing and where it is doing it: the same individual calls differently in open air, along an edge, inside clutter and on approach to prey. Species that hunt in the same kind of space converge on the same call structure however distantly related they are. A call is evidence about a species. It is rarely a signature of one.

So an identification built from a handful of published parameter ranges fails in a particular and dangerous way — it fails confidently. Those ranges overlap between species, and they shift geographically: values measured on a European or North American assemblage do not carry over to an Indian one, where the species pool is different and reference material is thinner. Without reference recordings from animals of known identity in the region, and without the ecology to know which species could plausibly be at the site at all, the output is a species list that reads as authoritative and cannot be defended under scrutiny. We would rather name a genus, or a species pair, and state why the calls do not separate further.

What the site decides

Biogeography and species poolThe assemblage that can plausibly occur, built from distribution and from regional records — not a national checklist applied to a point on a map.
Habitat and structureKarst, canopy, water, edge and open ground each support a different guild and call for different detector placement. A single deployment design across unlike habitats samples one of them properly.
ElevationAssemblages turn over with elevation, and so does the effort needed to detect them. A gradient is surveyed as a gradient, with stations stratified across it.
Season and phenologyMaternity, swarming, hibernation and migration are different questions about the same site. A single visit answers whichever one it happened to land in, and is silent on the rest.
Atmospheric conditionsTemperature and humidity change how far an ultrasonic call carries before it attenuates below the detector's threshold. Unrecorded, they change what an absence means without anyone noticing.
Survey effort, derivedNights, stations and spacing set from the detection probability for the target species, and stated alongside the design, so the effort can be judged rather than taken on trust.

Assessable by someone who was not there

Raw data retainedRecordings kept with their metadata intact — time, location, detector, settings — so a reviewer can return to the signal behind any identification in the report.
Deployment recordedDetector positions, heights, orientations, trigger settings and calibration written down as configured in the field, not as specified in the proposal.
Identification criteria writtenThe call parameters on which each identification rests, stated. Automated classification is verified by a person before it reaches a table.
Reported at the resolution the calls supportWhere a recording does not separate two species, it is reported as the pair and said so. Rounding an uncertain call up to a species is the most common way a bat report becomes wrong.
Expertise we do not have, we bring in.

No team is expert in everything an assessment can touch. Where a project raises a question outside our competence — an unfamiliar taxon, a habitat we have not worked in, a statistical design that needs a statistician — we bring in a subject-matter expert, from our collaborators or independently, and their contribution is named in the report. That is cheaper than being wrong, and more useful to you than a confident guess.

Tell us what you need assessed.

Send the site, the sector and the stage you are at, and we will tell you what the work involves and whether we are the right people for it. If a study does not need doing, we will say so.